Invitation for Bids for the Construction of Bus Terminals at Mile 12 and Ikorodu and Sub-Terminal at Agric/Construction of Bus Shelter & Platform, Lagos State

Posted by Ijeoma on Thu 05th Dec, 2013 - nigeriantenders.com






The Lagos State Government has received credit from the International Development Association towards the cost of Lagos Urban Transport Project (LUTP II), and it intends to apply part of the proceeds of this credit to payments under the contract for the Construction of Bus Terminals at Mile 12 and Ikorodu and Sub-Terminal at Agric / Construction of Bus Shelters & Platforms.

Invitation for Bids for the Construction of Bus Terminals at Mile 12 and Ikorodu and Sub-Terminal at Agric/Construction of Bus Shelter & Platform

This Invitation for Bids follows the General Procurement Notice for this Project titled NG Nigeria-LUTP-IT (FY10) that appeared in dg market publication of July 16, 2010.

Contract Nos: LAMATA/WB/IDA/PT/NCB/BRT-TERMINAL/LUTPII/PK 1/LOT 1/09/13
LAMATA/WB/IDA/PT/NCB/BRT-TERMINAL/LUTPII/PKI/LOT 2/10/13
LAMATA/WB/IDA/PT/NCB/BRT-BUS SHELTERS/LUTPII/PK 2/LOT 1/07/13
LAMATA/WB/IDA/PT/NCB/BRT-BUS SHELTERS/LUTPII/PK 2/LOT 2/08/13
IDA Credit No.: 4767 —UN
I.

The Lagos Urban Transport Project (LUTP) now invites sealed bids from eligible and qualified bidders for the Construction of Bus Terminals at Mile 12 and Ikorodu and Sub-Terminal at Agric “Construction of Bus Shelters & Platforms.

The lotting and the works details are as follows;
Package

  • Lot1
Brief Job Description: Construction of Mile 12 Terminal
Construction Period (Months): 12
Amount of Bid Security: NGN 34 Million
Bid Validity Period (Days): 120
Minimum Average Annual Turnover: NGN 2.69 Billion
Cash Flow: NGN 449 Million


  • Lot 2
Brief Job Description: Construction of Ikorodu Terminal and Agric Sub-Terminal
Construction Period (Months): 12
Amount of Bid Security: NGN 19 Million
Bid Validity Period (Days): 120
Minimum Average Annual Turnover: NGN 1.61 Billion
Cash Flow: NGN 268 Million

  • Lot 3
Brief Job Description: Construction of Bus Shelters & Platforms (7No)
Construction Period (Months): 12
Amount of Bid Security: NGN 7.5 Million
Bid Validity Period (Days): 120
Minimum Average Annual Turnover: NGN 622 Million
Cash Flow: NGN 104 Millio
n

  • Lot 4
Brief Job Description: Construction of Bus Shelters &Platforms (8No)
Construction Period (Months): 12
Amount of Bid Security: NGN 12 Million
Bid Validity Period (Days): 120
Minimum Average Annual Turnover: NGN 980 Million
Cash Flow: NGN 163 Million

The scope of works for each of the lots is detailed in section VI -works requirement of the bidding document. The bill of quantities the drawings and specification describes in detail the works elements required for projects of this nature, magnitude and complexity
  • Bidding will be conducted through the National Competitive Bidding (NCB) procedures specified in the World Bank’s Guidelines: Procurement under IBRD Loans and IDA Credits, and is open to all bidders from Eligible Source Countries as defined in the Bidding Documents for the four lots.
  • Interested eligible bidders may obtain further information from Lagos Urban Transport Project (LUTP) and inspect the Bidding Documents at the address given below from 8 am to 4pm Mondays through Friday from December 5, 2013.
Closing date: 10th January, 2014

Time:
10:00am

For Each Lot: Qualifications requirements include:
  • Possession of experience as a Prime Contractor for at least the lust five (5) years prior to the application submission deadline and with work cited should be at least 70% complete.
  • Is Minimum average annual turnover in construction works as’ denominated in Nigeria currency in paragraph 3 or its equivalent in a freely convertible international currencies in the last three years in works that have been successfully and substantially completed and that are similar to the propo.ved works under this contract
  • Project Manager with BSc. Civil Engineering and at least 15 years experience in Works of equivalent nature and volume;
  • Provide Annual audited account for the last 3 tears: to demonstrate the current soundness of the applicant financial position and its prospective long term pmfitabi1it and have Liquidity and/or evidence of access to or availability of confirmed positive credit facilities of not less than the amount in paragraph 3 above.
A margin of preference for eligible national contractors/joint ventures shall not be applied.
  • A complete set of Bidding Documents in English Language may be purchased by interested bidders on the submission of a written Application to the address below and upon payment of a non refundable fee of Thirty Thousand Naira (N30.000.00) in Bank draft payable to LAMATA per Lot. Interested Bidders may obtain further information at the address below.

Please note:
  • Bids must be delivered to the address below.
  • Electronic bidding shall not be permitted.
  • Late bids will be rejected.
  • Bids will be opened physically in the presence of the bidders’ representatives, who choose to attend in person at the address below by 10am on January 10th, 2014.
  • All bids shall be accompanied by a Bid Security of the amount in the table in paragraph 3 for each of the Lots.
The address referred to above is:

Managing Director,
Lagos Metropolitan Area Transport Authority (LAMATA)
Block C, 2nd floor, Motorway center, 1, Motorways Avenue
Alausa, Ikeja, Lagos State
Telephone: 234-1-2702778-82, Fax: 234-1-2702784
E-mail:
advert@lamata-ng.com or adabiri@lamata-ng.com