This Specific Procurement Notice (SPN) follows the publication of the General Procurement Notice GPN for this Project, which appeared in the UN Development Business Issue No: No. 608 August 16th 2007 and re-issued on 17th Dec.2013, which appeared on Daily Trust & the Nation Newspapers.

Federal Republic of Nigeria Invites to Tender for the Rehabilitation/Construction of Rural Roads in Osun State

The Federal Government of Nigeria, through the Federal Ministry of Agriculture and Rural Development, has received financing from the International Development Association (IDA) and French Development Agency (AFD) (hereafter called the Financing) and on-lent the Financing to four participating states (Adamawa, Enugu, Niger, and Osun) towards the cost of rehabilitation of prioritized rural roads in these states under the Second Rural Access and Mobility Project (RAMP-2). It is intended that part of the proceeds of this Financing will be applied to eligible payments under the contracts for the Rehabilitation/Construction of prioritized rural roads in Osun State (hereafter called the Borrower)” The Osun State Project Implementation Unit (SP1U), of the Rural Access and Mobility Project (RAMP) on behalf of Osun State Government invites sealed bids from prospective bidders for the rehabilitation/construction works in the following lots:-

 Pataara-Ileko-Oba-Odo-Omi- farm settlement Road 1: 4.6 Lengths (km)

  • Lot 1: (Iwo Region)

  • Agbowu/Ogbaagaa-Idiroko-Eleru-Bode-Osi-AbaOnile: 11.6 Lengths (km)
  • Bode-Osi-township-Asa Junction (Double Bituminous Surface Treatment (DBST): 1.4 Lengths (km)
  • Asa-Dagbolu-Ajagunlaase (Double Bituminous Surface Treatment (DBST): 3.1 Length (km)
  • Eleke-Kanko: 3.91 Lengths (km)
  • Agoro-Ikonifin: 11.6 Lengths (km)
  • Ikonifin-Sade-Ajagunlaase: 13.63 Lengths (km)
  • Akinleye-Aba Ayo-Isero: 7 Lengths (km)
  •  Farm Settlement Spur: 1.9 Lengths (km)
  • Description of Work: Rehabilitation/construction of 58.74km Rural Roads
  • L.G.A: Ola Oluwa, Ola Oluwa, Ola Oluwa, Ayedire, Iwo/Ola, Oluwa, Ola Oluwa, Iwo, Iwo, Iwo
  • Duration: 18 months

Lot 2 (Ife Region-1)

  • Jagun Osi/Onikoko-Osi Sooko: 10.5 Lengths (km)
  •  Osi-Sooko-Osi Ara (Elebu): 9.5 Lengths (km)
  • Osi-Ara-Falala (Yimin Oja): 9.3 Lengths (km)
  • Alogba (Gbengbeleku Junction) Owode Amu: 10.9 Lengths (km)
  • Owode Amu-Oyere Fadehan: 18.2 Lengths (km)
  • Description of works: Rehabilitation/construction of 58.4km Rural Roads            
  • L.G.A: Ife-South, Ife-South, Ife-South, Ife-South, Ife-North
  • Duration: 18 months

Lot 3 (Ife Region 2):

  • Shasha Road (Lawoka Junction)- Apoje Junction: 53.87 Lengths (km)
  • Description of work: Rehabilitation/construction of 53.61km Rural Roads
  • L.G.A: Ife-North
  • Duration: 18 months
Lot 4 (llesha Region):
  • Ilesa-Odogbo-Araromi-Igbowiwi: 8.73 Lengths (km)
  • Ilesa-llo Olo boundary (Double Bituminous Surface Treatment (DBST): 3 Lengths (km)
  • Ira –Ikeji-ile-Jabu: 8.3 Lengths (km)
  • Ira Township Double Bituminous Surface Treatment (DBST): 1 Length (km)
  • Ira-ikeji-ile-Ajebandele/Arinmo
  • Ira-Ikeji -OIle-Oligeri-Iragbiji: 2 Lengths (km)
  • Oniyo-Ogbomoso: 11.3 Lengths (km)
  • Isale General Hospital township road (Doyble Bituminous Surface Treatment (DBST): 1 Lengths (km)
  • Odogbo-Iwara: 6.58 Lengths (km)
  • L.G.A: Atakumosa East, Atakumosa East, Oriade, Oriade, Oriade, Oriade, Oriade, Ilesa, Ilesa, Atakumosa East.

The Works generally include; site clearance: minor earthworks ;provision of sub-base; provision of lateritic base course; limited quantities of Double Bituminous Surface Treatment (DBST); trapezoidal side drains; lined side drains; single and multiple concrete pipe culvert extensions and new culverts; reinforced concrete box culverts; road signs and other road furniture.

Complete set of bidding documents for any of the lots may be purchased at the Office addresses below upon payment of a non-refundable fee of Fifteen thousand Naira (N15, 000) for one Lot only, and any additional lot will include a fee of Ten Thousand Naira (N10, 000) only, payable to STERLING BANK Plc;

  • Account Name: Osun Rural Access and Mobility Project (RAMP11)
  • Account Number: 0023494012

State Project Coordinator,
Rural Access & Mobility Project (RAMP),
Osun State Project Implementation Unit,
Ministry of Water Resources,
Rural Development and Community Affairs,
PMB 4362,
State Secretariat Complex,
Osogbo, Osun State,
Nigeria.
Tel: +234 803- 356-5979+234 803- 356-5979, +234 803-387-3763803-387-3763
E-Mail:
osunramp12@yahoo.com

OR

State Project Coordinator,
Rural Access & Mobility Project (RAMP),
Osun State Project Implementation Unit,
Old Government Press Building,
(NAFDAC Office Compound),
Testing Ground Area,
P.M.B 4414, Osogbo,
Osun State,
Nigeria.
Tel: +234 803- 356-5979+234 803- 356-5979, +234 803-387-3763803-387-3763
E-Mail:
osunramp12@yahoo.com

Interested bidders may obtain further information and inspect the bidding documents at the same address. The instructions to bidders and general conditions of contract contained in the bidding documents comply with the FGN Standard Bidding Documents SBD for the procurement of Works.
Bids shall be valid for a period of 120 days after Bid Opening and must be accompanied by security for each lot as follows;

  • Lot1 =N17, 000, 000. 00
  • Lot2 =N16, 000, 000. 00
  • Lot3= N15, 000, 000. 00
  • Lot4 =N21, 000,000.00

Closing date: 15th April, 2014
Time: 12:00noon

Please note that:

  • Bids shall be delivered at the OSUN RAMP 2 State Project Implementation Unit at the office address above.
  • Bids will be opened at the same address at 12 noon local time on the same date of closing date and in the presence of bidders’ representatives who choose to attend.
  • Electronic bid submission wilt not be accepted.
  • A pre-bid conference will be held at the office address above on 28th March, 2014, which is two weeks before bid opening by 12noon to allow potential bidders to seek clarifications on the bidding documents.
  • This Publication Supersedes That of Thursday, 27th February, 2014
Industry

;
Category

;
State

;