Eko Electricity Distribution Company (EKEDC) invites reputable contractors/suppliers to submit pre-qualification documents for the supply of the following equipment:
The Eko Electricity Distribution Company (EKEDC) has received a CREDIT facility from the Central Bank of Nigeria (CBN) for Accelerated Transmission Distribution Interface Projects to invest in the Transmission Company of Nigeria (TCN)’s rehabilitation and expansion projects.
Applications are invited for:
Title: Pre-Qualification to Tender for Rehabilitation Projects and Equipment Supply for 132/33KV Transmission Lines & Substations
Scope of Work
LOT/EKEDC/SS/1:
- Upgrading of 1X40MVA & 1x45MVA, 132/33kV power transformers with 2x60MVA,132/33kv,
- Construction of additional 33kV feeder boys and
- Conversion of indoor Circuit breaker to outdoor at Akoka 132/33kV Substation,
LOT/EKEDC/SS/2:
- Replacement of faulty 60MVA 132/33KV Transformer and
- Installation of 3x33kV Feeder bays at Isolo 132/33kV Substation.
LOT/EKEDC/SS/3:
- Construction of 3x33kV feeder bays
- Rehabilitation of problematic indoor circuit breakers and
- Faulty 33kv panel to be replaced, at Ojo 132/33kV Substation,
LOT/EKEDC/SS/4:
- Upgrading of 2x45MVA, 132/33kV power transformer with 2x100/ 125 MVA, 132/33kV and
- Construction of additional 3x33kV feeder bays at Agbora 132/33kV Substation.
LOT/EKEDC/SS/5:
Supply of:
- 2 No 150/165 MVA, 330/132/33kV Power Transformer
- 2 No 100/125 MVA, 132/33kV Power Transformer
- 2 No 60/66MVA, l32/33kV Power Transformer
- 1 No 60/66 MVA, 132/33kV Mobile transformer
LOT/EKEDC/SS/6:
- Eko Atlantic City Transmission Line Engineering Design, Procurement, Construction and Commissioning of 132kV Double Circuit transmission line from Lekki Substation to the proposed 132/33kV Atlantic City proposed substation on Steel Poles towers with pile foundations.
- Eko Atlantic City Transmission Substation Engineering Design, Procurement, Construction and Commissioning of 2 X 60MVA 132/33kV Eko Atlantic City GIS Substation
Eligibility Requirements (Nigerian Companies Only)
Suitable Nigerian Companies are invited to participate in the pre-qualification exercise by submitting the following pre-requisite requirements:
- Certificate of Incorporation with the Corporate Affairs Commission (CAC) in Nigeria with forms (C02 and C07).
- Current Tax Clearance Certificate for the past three years valid till Dec. 2019
- Three years Company Audited Financial Statement for the period of 2018-2020 duly stamped by a registered Audit firm.
- PENCOM compliance Certificate valid till 31st December 2021.
- Industrial Training Fund (ITF) compliance Certificate Valid till 31st December 2021.
- Nigeria Social Insurance Trust Fund (NSITF) Compliance Certificate valid till 31st December 2019.
- NEMSA Compliance Certificate valid till 31st December 2021.
For Joint Venture Partnerships, the Joint Venture Agreements must be signed by all the parties, a copy of which must be attached. In addition, all partners meet the above requirements.
Qualification Requirements
The under listed qualification requirements applies to Applicants including(Joint ventures)
- Minimum average Annual Construction turnover over the past three (3) years as shown below:
- Two hundred and fifty million Naira (NGN250, 000,000.00)
- The Applicant shall demonstrate that it has access to, or has available liquid assets, unencumbered real assets, lines of credit, and other financial means (independent of any contractual advance payment) sufficient to meet the construction cash flow requirements.
- Evidence of Experience of at least two (2) projects of similar nature and complexity completely executed in the last five years. including final Taking-Over Certificates from clients.
- All equipment, materials and switch gear to be imported and used under the TCN/EKEDC must come from Manufacturers who have European Certification and or KEMA such that such can be shipped via Europe, and those from Americas. Japan should be pre-approved and accepted by us. Evidence of Such Certification must be submitted along with the Pre-qualification Documents. Companies will not be allowed to change origin before and after submission of OEM.
- Company Profile Including: Populated organizational structure and key professional staff with relevant experience on high voltage power lines and substations.
Opening of Application
12:00 Noon Wednesday, 21st July, 2021 at the above Stated address.
Submission of Documents
One soft and two hard copies of the documents are to be submitted, The names and mailing addresses at the applicant Companies must be clearly marked on the envelope (s) bearing the submissions. All the Information requested for pre-qualification must be, provided in English Language by all applicants.
Failure to provide information/supporting documents that is essential for the evaluation at applicant’s qualifications, or to provide timely clarification or substantiation of the information supplied may result in disqualification af the applicant. Completed pre-qualification applications should be submitted in sealed envelopes clearly marked "APPLICATION FOR PRE-QUALIFICATION".
Please Note
- Applications submission after the deadline shall be returned unopened to the respective Applicants.
- EKEDC reserves the right to verify any claim by Applicants and should, therefore, include in their submissions Necessary authority and guarantee for such verification.
- This advertisement shall not be construed as a commitment on the port of EKEDC to pre-qualify any Applicant.
For further information and/or clarification, please contact any of the following e-mai addresses: