| Lot | Project | Lot Reference | Bis Security | Bid Validity |
| Lot 1 | Proposed Construction of 33kV Wuse 2 Relief Feeder from Katampe 3 to B52 33/11kV Injection Substation Wuse 2 | AEDC 1 | 2% of bid value | 90 days |
| Lot 2 | Rehabilitation of Feeder 8 & feeder 3 from Central Area TS dual Circuit (Phase 1) | AEDC 5 | 2% of bid value | 90 days |
| Lot 3 | Proposed construction of 2x7.5MVA, 33/11kV injection substation and creation of new 33kV feeder from Katampe 3 at Ministers quarters Mabuchi (Recovery and Replacement of 60No 33KV/11kV Transformers) | AEDC 8 | 2% of bid value | 90 days |
| Lot 4 | Proposed Construction of 33kV Katampe Feeder from Katampe 3 TS to Relief 33kV Gwarinpa Feeder and Dawaki Feeders | AEDC 9 | 2% of bid value | 90 days |
| Lot 5 | Rehabilitation of feeder ring main 1B from 2x15MVA 33/11kV Injection substation along Kashim Ibrahim Road Wuse 2 (B52) | AEDC 10 | 2% of bid value | 90 days |
| Lot 6 | Proposed Installation of additional 1X15MVA Transformer at M44 33/11kV Injection substation Gwarinpa | AEDC 11 | 2% of bid value | 90 days |
| Lo t7 | Proposed Construction of dual 33kV feeder from Apo TS to Yayale junction | AEDC 12 | 2% of bid value | 90 days |
| Lot 8 | Proposed construction of 2N0,11KV feeders from 2 x 15MVA, 33/11kV Injection s/s at Apo T/S to Trade More and environ in Lokogoma | AEDC 14 | 2% of bid value | 90 days |
| Lot 9 | Proposed construction of additional 1 x 7.5MVA, at Apo Resettlement | AEDC 15 | 2% of bid value | 90 days |
| Lot 10 | Proposed extension of 33kV feeder L33 from Gwagwalada TS to feed Leleyi, Gwari 1 | AEDC 17 | 2% of bid value | 90 days |
| Lot 11 | Creation of additional 11kV feeder to relived existing feeders in Lugbe from 33/11kV 2X15MVA injection substation Lugbe | AEDC 18 | 2% of bid value | 90 days |
| Lot 12 | Proposed construction of 33kv feeder from Karu TS to Kpeyegyi to relife 33kV feeder K2 to improve supply to Karshi and environs | AEDC 22 | 2% of bid value | 90 days |
| Lot 13 | Proposed construction of 2No 11kV feeders, replacement of 3No Circuit Breakers at Dikko injection substation (Sabon Wuse) | AEDC 24 | 2% of bid value | 90 days |
| Lot 14 | Rehabilitation of 2X15MVA 33/11kV Field base injection substation and reconfiguration of 5Nos 11kV FDRS | AEDC 25 | 2% of bid value | 90 days |
| Lot 15 | Dua-lization of 20km 33kV Uke/Masaka fdr from Keffi TS | AEDC 29 | 2% of bid value | 90 days |
| Lot 16 | Replacement and Rehabilitation of 11kV switch gear at L14 2 X 7.5MVALafia Injection substation | AEDC 31 | 2% of bid value | 90 days |
| Lot 17 | Rehabilitation of 33kV Lapai Feeder from Minna TS | AEDC 33 | 2% of bid value | 90 days |
| Lot 18 | Rehabilitation of 33KV NNPC Water works feeder from Minna TS | AEDC 34 | 2% of bid value | 90 days |
| Lot 19 | Creation of 11kV Bank feeder from 2x15MVA 33/11kV Power House Injection Substation Minna | AEDC 35 | 2% of bid value | 90 days |
| Lot 20 | Installation of 5MVA /11kV substation at FUT Minna | AEDC 38 | 2% of bid value | 90 days |
| Lot 21 | Replacement of failed 33/11kV 2.5MVA with 5MVA at CBN Minna | AEDC 39 | 2% of bid value | 90 days |
| Lot 22 | Rehabilitation of 11kV Township feeder AEDC 40 Minna | AEDC 40 | 2% of bid value | 90 days |
| Lot 23 | Replacement of 11kV defective RMU in the FCT regions | AEDC 48 | 2% of bid value | 90 days |
| Lot 24 | Procurement of CRM for enhancement of customer services | AEDC 49 | 2% of bid value | 90 days |
| Lot 25 | AMI Infrastructure | AEDC 50 | 2% of bid value | 90 days |
| Lot 26 | Smart Feeder Meters for station service consumption | AEDC 53 | 2% of bid value | 90 days |
| Lot 27 | MD HV metering Panel | AEDC 54 | 2% of bid value | 90 days |
| Lot 28 | 11kV indoor breakers incomer at / Suleja, Lokoja, Minna, New Nyanya and Apo Resettlement | AEDC 55 | 2% of bid value | 90 days |
| Lot 29 | indoor breakers outgoing Suleja, Lokoja, Minna, New Nyanya and Apo Resettlement | AEDC 56 | 2% of bid value | 90 days |
| Lot 30 | Procurement of Instrument Transformers (CTS and VTs) for use in our Injection substations at Suleja, Lokoja, Minna, New Nyanya and Apo Resettlement | AEDC 60 | 2% of bid value | 90 days |
| Lot 31 | Rehabilitation of Lower Voltage Network in critical areas across AEDC franchise areas | AEDC 61 | 2% of bid value | 90 days |
| Lot 32 | Procurement of 34 feet and 28 feet (HT & LT) fibre ladders across AEDC franchise areas | AEDC 63 | 2% of bid value | 90 days |
| Lot 33 | 33kV Auto Recloser Company wide (Materials for Installation) | AEDC 64 | 2% of bid value | 90 days |
| Lot 34 | 110v Tripping unit: battery charger Company wide | AEDC 65 | 2% of bid value | 90 days |
| Lot 35 | 200Amp battery bank, 9 per set company wide | AEDC 66 | 2% of bid value | 90 days |
| Lot 36 | Clamp on Ammeter for company use | AEDC 69 | 2% of bid value | 90 days |
| Lot 37 | Procurement of Avometer for company use | AEDC 70 | 2% of bid value | 90 days |
| Lot 38 | ction and notification system (FCI) | AEDC 76 | 2% of bid value | 90 days |
| Lot 39 | Procurement of Clamp on Ammeter for RPU and Transformer Load readings | AEDC 78 | 2% of bid value | 90 days |
| Lot 40 | Remote monitoring and remote control of 415V distribution transformer (DT) and artificial intelligence and data mining | AEDC 79 | 2% of bid value | 90 days |
| Lot 41 | Construction of 10KM 33kv Feeder for 1 X 60MVA Ajaokuta TS Ajegu Junction, including 4 nos towes | AEDC 80 | 2% of bid value | 90 days |
| Lot 42 | Rehabilitation of 33KV Lafia Feeder from Akwkja TS and Rehabilitation of 28Km 11KV feeder within Lafia | AEDC 81 | 2% of bid value | 90 days |
| Lot 43 | Purchase of AMI Smart Meters required for metering of MDAS | AEDC 82 | 2% of bid value | 90 days |
| Lot 44 | Completion of abandoned 2 x 15MVA, 33/11kV injection substation at New Nyanya Nasarawa State and radiation of 33kV feeder from 2X60MVA 132/33kV Karụ TCN | AEDC 21B | 2% of bid value | 90 days |
| Lot 45 | Construction of 30Nos 500kVA Relief Substations and replacement across AEDC franchise areas | AEDC 41B(1-30) | 2% of bid value | 90 days |