FEDERAL EXECUTIVE COUNCIL APPROVED CONTRACTS FOR JUNE 03, 2009
Recommended Contractors: Messrs. Beamco Nigeria Limited
Contract Sum (N): 4,399,471,486.25
Completion Period (Weeks): 96
1.2.) Lot/Description: Students Hostel
Recommended Contractors: Messrs. Footmark Engineering Construction Ltd.
Contract Sum (N): 907,702,737.35
Completion Period (Weeks): 47
1.3.) Lot/Description: 500 Seat Auditorium
Recommended Contractors: Messrs. Chartered Endeavour Nigeria Limited
Contract Sum (N): 260,468,672.00
Completion Period (Weeks): 30
1.4.) Lot/Description: Technology Development Wing
Recommended Contractors: Messrs. Edil Belmonte Ltd.
Contract Sum (N): 1,330,814,463.01
Completion Period (Weeks): 50
1.5.) Lot/Description: Management Wing
Recommended Contractors: Messrs. A.G. Ferrero Ltd.
Contract Sum (N): 1,289,910,442.05
Completion Period (Weeks): 78
1.6.) Lot/Description: Administrative Building
Recommended Contractors: Messrs. Safe Nigeria Ltd
Contract Sum (N): 1,081,832,030.25
Completion Period (Weeks): 52
1.7.) Lot/Description: Graduate School
Recommended Contractors: Messrs. Vicam Consult
Contract Sum (N): 655,570,339.75
Completion Period (Weeks): 48
1.8.) Lot/Description: Library
Recommended Contractors: Messrs. Sazak Nigeria Limited
Contract Sum (N): 480,027,871.85
Completion Period (Weeks): 24
1.9.) Lot/Description: Asphalt Roads/Drainages & Walkways
Recommended Contractors: Messrs. Dekit Construction Ltd
Contract Sum (N): 806,149,030.01
Completion Period (Weeks): 32
1.10.) Lot/Description: External Electrical Works I
Recommended Contractors: Messrs. Alpha Praxis Nig. Ltd.
Contract Sum (N): 526,965,142.00
Completion Period (Weeks): 20
1.11.) Lot/Description: External Electrical Works II
Recommended Contractors: Messrs. Oscar Fiber Nigeria Ltd.
Contract Sum (N): 448,475,940.00
Completion Period (Weeks): 24
1.12.) Lot/Description: External Lighting System
Recommended Contractors: Messrs. Niya Engineering Limited
Contract Sum (N): 369,202,900.00
Completion Period (Weeks): 32
1.13.) Lot/Description: Telephone Data and Networking System
Recommended Contractors: Mesrs. Resoursery Ltd
Contract Sum (N): 475,630,889.99
Completion Period (Weeks): 16
1.14.) Lot/Description: Vertical Transportation System
Recommended Contractors: Messrs CFAO Technologies Ltd.
Contract Sum (N): 343,581,700.00
Completion Period (Weeks): 36
1.15.) Lot/Description: Kitchen and Laundry Equipment
Recommended Contractors: Messrs. Hotel & Catering Supplies House Ltd.
Contract Sum (N): 365,989,800.00
Completion Period (Weeks): 20
1.16.) Lot/Description: Architectural Consultant I
Recommended Contractors: Messrs. Multi-Systems
Contract Sum (N): 112,015,319.85
1.17.) Lot/Description: Architectural Consultant II
Recommended Contractors: Messrs. Archimodes Associates
Contract Sum (N): 170,828,163.43
1.18.) Lot/Description: Civil/Structural Engineering
Recommended Contractors: Messrs. Yolas Consultants
Contract Sum (N): 158,149,410.96
1.19.) Lot/Description: Quantity Surveying Consultant
Recommended Contractors: Messrs. Ultimate Cost Consultants
Contract Sum (N): 156,410,363.35
1.20.) Lot/Description: Electrical/Mechanical Consultant
Recommended Contractors: Messrs. Samabot Associates
Contract Sum (N): 241,355,848.51
Total: 14,580,552,730.61
2.) Contract Item / Service: Award of Contract for the Supply of Blades, Blade Accessories and Provision of Manpower Services for the Re-blading of GT 18 and the Diagnostic Inspection of GT 13 at Afam Power Plc.
Name of Company: Messrs. Alstom Ltd.
Cost: Euro 10,630,604.39 equivalent to N 2,027,008,563.23
Date: 3rd June, 2009
Duration: 5 Months
3.) Contract Item / Service: Award of contract for the Preparation of Electricity Master Plan for Phase III Area of the Federal Capital City, Abuja
Name of Company: Messrs. Mega-Project Engineering Limited
Cost: N146,368,267.50
Date: 3rd June, 2009
Duration: 6 Months
4.) Contract Item / Service: Award of Contract for the Design, Supply, Installation and Commissioning of 10MW Wind Farm at Katsina
Name of Company: Messrs. Vergnet SA of France
Cost: Euro 18,500,000 Plus N 494,020,000.00
Date: 3rd June, 2009
Duration: 20 Months
5.) Contract Item / Service: Award of Contract for the Manufacture and Supply of 7Nos. Tangent- Delta/Dissipation Factor Test Equipment
Name of Company: Messrs. Omicron GmbH and Training of 30 Engineers
Cost: Euro 460,090.00 Plus N 25,870,948.34
Date: 3rd June, 2009
Duration: 5 Months
6.) Contract Item / Service: Award of Contract for the Rehabilitation and Expansion of the Sapele Power Plant Substation
Name of Company: Messrs. AK-AY ELEKTRIK DIS TICARET & Messrs. AK-AY ELEKTRIK (Nigeria) Limited
Cost: Euro 17,442,466.32 Plus N 342,718,215.02
Date: 3rd June, 2009
Duration: 15 Months
7.) Award Of Contracts For The New Transmission Projects
7.1.) TCN Project Description: Award of Contact for the Design, Manufacture, Supply, Installation and Commissioning of Adhesive Lashing Optic Fibre Cable on the Sky Wire along Shiroro-Jebba-Oshogbo Route
Contractor/Consultant: Messrs. TNT Projects Ltd. in partnership with Prysmain Cable & System, Barcelona, Spain
Reviewed Project Cost (N): 558,651,682.00
7.2.) TCN Project Description: Award of Contract for the Extension of Kainji 330KV Substation Construction of 1x150MVA 330/132KV Substation at Kainji & Construction of 2x30/40MVA Substation at New Bussa in Kwara State and 2x60MVA/132/33KV S/S at Ayobo & Ikeja West- Ayobo 132 KV D/C Lines
Contractor/Consultant: Messrs. MBH Power Limited & Messrs LAGA/CE Power Solutions
Reviewed Project Cost (N): 6,844,940,892.94
7.3.) TCN Project Description: Award of Contract for the Design, Engineering Design, Manufacture, Supply, Installation and Commissioning of Digital Communication Facilities in Transmission Substations – Lot 1 Fibre optics Transmission
Contractor/Consultant: Messrs. Siemens Limited
Reviewed Project Cost (N): 244,058,052.51
7.4.) TCN Project Description: Award of Contract for the Design, Engineering Design, Manufacture Supply, Installation and Commissioning of the Reinforcement of Birnin-Kebbi & Kano (Kumbotso) Transmission Substations (Lot 2008 – 7)
Contractor/Consultant: Messrs. MBH Power Limited
Reviewed Project Cost (N): 3,000,357,392.62
7.5.) TCN Project Description: Award of Contract for the Design, Manufacture, Supply, Installation and Commissioning of the Reinforcement of Afam TS with 1x150MVA, 330/132/33kV Transformer & Construction of Afam IV – Afam III Double Circuit 132kv Line – (Lot 2008-10)
Contractor/Consultant: Messrs. Taleveras Group/UMEL Dalekomontaza
Reviewed Project Cost (N): 1,268,539,218.25
7.6.)TCN Project Description: Award of Contract for the Design, Manufacture, Supply, Installation and Commissioning of Kainji – New Bussa 132kV Double Circuit Transmission Lines with 330kV Single Circuit River Crossing at Kainji under Lot 2008-3
Contractor/Consultant: Messrs. Jaguar Overseas /Willands Engineering Limited
Reviewed Project Cost (N): 291,589,265.91
7.7.) TCN Project Description: Award of Contract for Additional Works on the Construction of 1x30/40MVA 132/33KV Substation at Amukpe (Sapele)
Contractor/Consultant: Messrs. News Engineering Nigeria Limited
Reviewed Project Cost (N): 380,971,332.00
7.8.) TCN Project Description: Award of Contract for onstruction of Ikorodu – Odogunyan Shagamu 132kv Double Circuit
Contractor/Consultant: Messrs. PPCL/Westcom Joint Venture
Reviewed Project Cost (N): 2,819,336,140.05
Total TCN Projects: 15,408,443,976.28