FEDERAL EXECUTIVE COUNCIL APPROVED CONTRACTS FOR JUNE 03, 2009

1.) Award of Contracts for the Construction of the National College of Petroleum Studies, Kaduna

1.1.) Lot/Description:  International Conference Centre

Recommended Contractors: Messrs. Beamco Nigeria Limited 

Contract Sum (N):  4,399,471,486.25 

Completion Period (Weeks):
  96

 

1.2.) Lot/Description:  Students Hostel

Recommended Contractors:  Messrs. Footmark Engineering Construction Ltd.

Contract Sum (N):   907,702,737.35 

Completion Period (Weeks):  47

 

1.3.) Lot/Description:  500 Seat Auditorium  

Recommended Contractors:  Messrs. Chartered Endeavour Nigeria Limited

Contract Sum (N):  260,468,672.00

Completion Period (Weeks):   30

 

1.4.) Lot/Description:   Technology Development Wing 

Recommended Contractors:   Messrs. Edil Belmonte Ltd. 

Contract Sum (N):  1,330,814,463.01 

Completion Period (Weeks):  50

 

1.5.) Lot/Description:  Management Wing 

Recommended Contractors:  Messrs. A.G. Ferrero Ltd. 

Contract Sum (N):  1,289,910,442.05 

Completion Period (Weeks):  78

 

1.6.) Lot/Description:  Administrative Building 

Recommended Contractors:  Messrs. Safe Nigeria Ltd

Contract Sum (N):   1,081,832,030.25

Completion Period (Weeks):   52

 

1.7.) Lot/Description:  Graduate School

Recommended Contractors:  Messrs. Vicam Consult

Contract Sum (N):  655,570,339.75

Completion Period (Weeks):  48

 

1.8.) Lot/Description:  Library  

Recommended Contractors:  Messrs. Sazak Nigeria Limited 

Contract Sum (N):  480,027,871.85

Completion Period (Weeks):  24

 

1.9.) Lot/Description:  Asphalt Roads/Drainages & Walkways

Recommended Contractors:  Messrs. Dekit Construction Ltd

Contract Sum (N):    806,149,030.01

Completion Period (Weeks):  32

 

1.10.) Lot/Description:  External Electrical Works I 

Recommended Contractors:  Messrs. Alpha Praxis Nig. Ltd. 

Contract Sum (N):  526,965,142.00 

Completion Period (Weeks):  20

 

1.11.) Lot/Description:  External Electrical Works II 

Recommended Contractors:  Messrs. Oscar Fiber Nigeria Ltd. 

Contract Sum (N):  448,475,940.00 

Completion Period (Weeks):  24

 

1.12.) Lot/Description:  External Lighting System 

Recommended Contractors:  Messrs. Niya Engineering Limited

Contract Sum (N):  369,202,900.00

Completion Period (Weeks):  32 

 

1.13.) Lot/Description:  Telephone Data and Networking System

Recommended Contractors:  Mesrs. Resoursery Ltd

Contract Sum (N):   475,630,889.99

Completion Period (Weeks):  16

 

1.14.) Lot/Description:  Vertical Transportation System

Recommended Contractors:  Messrs CFAO Technologies Ltd.

Contract Sum (N):  343,581,700.00

Completion Period (Weeks):  36

 

1.15.) Lot/Description:  Kitchen and Laundry Equipment

Recommended Contractors:  Messrs. Hotel & Catering Supplies House Ltd.

Contract Sum (N):  365,989,800.00

Completion Period (Weeks):   20

 

1.16.) Lot/Description:  Architectural Consultant I

Recommended Contractors:  Messrs. Multi-Systems

Contract Sum (N):  112,015,319.85

 

1.17.) Lot/Description:  Architectural Consultant II 

Recommended Contractors:  Messrs. Archimodes Associates 

Contract Sum (N):  170,828,163.43

 

1.18.) Lot/Description:  Civil/Structural Engineering

Recommended Contractors:  Messrs. Yolas Consultants 

Contract Sum (N):   158,149,410.96

 

1.19.) Lot/Description:  Quantity Surveying Consultant

Recommended Contractors:  Messrs. Ultimate Cost Consultants

Contract Sum (N):  156,410,363.35

 

1.20.) Lot/Description:  Electrical/Mechanical Consultant

Recommended Contractors: Messrs. Samabot Associates 

Contract Sum (N):   241,355,848.51

 

Total: 14,580,552,730.61

 

2.) Contract Item / Service:  Award of Contract for the Supply of Blades, Blade  Accessories and Provision of Manpower Services for the Re-blading of GT 18 and the Diagnostic Inspection of GT 13 at Afam Power Plc. 

Name of Company:  Messrs. Alstom Ltd.

Cost:  Euro 10,630,604.39 equivalent to N 2,027,008,563.23

Date:  3rd June, 2009

Duration:  5 Months

 

3.) Contract Item / Service:  Award of contract for the Preparation of Electricity Master Plan for Phase III Area of the Federal Capital City, Abuja

Name of Company: Messrs. Mega-Project Engineering Limited

Cost:  N146,368,267.50 

Date:  3rd June, 2009

Duration:  6 Months


4.) Contract Item / Service:  Award of Contract for the Design, Supply, Installation and Commissioning of 10MW Wind Farm at Katsina

Name of Company:  Messrs. Vergnet SA of France

Cost:  Euro 18,500,000 Plus N 494,020,000.00

Date:  3rd June, 2009

Duration:  20 Months

 

5.) Contract Item / Service:  Award of Contract for the Manufacture and Supply of 7Nos. Tangent- Delta/Dissipation Factor Test Equipment

Name of Company: Messrs. Omicron GmbH and Training of 30 Engineers 

Cost:  Euro 460,090.00 Plus N 25,870,948.34

Date:  3rd June, 2009

Duration:  5 Months

 

6.) Contract Item / Service:  Award of Contract for the Rehabilitation and Expansion of the Sapele Power Plant Substation

Name of Company: Messrs. AK-AY ELEKTRIK DIS TICARET & Messrs. AK-AY ELEKTRIK (Nigeria) Limited

Cost:  Euro 17,442,466.32 Plus N 342,718,215.02

Date:  3rd June, 2009

Duration:  15 Months

 

7.) Award Of Contracts For The New Transmission Projects

7.1.) TCN Project Description:  Award of Contact for the Design, Manufacture, Supply, Installation and Commissioning of Adhesive Lashing Optic Fibre Cable on the Sky Wire along Shiroro-Jebba-Oshogbo Route 

Contractor/Consultant:   Messrs. TNT Projects Ltd. in partnership with Prysmain Cable & System, Barcelona, Spain

Reviewed Project Cost (N):  558,651,682.00

 

7.2.) TCN Project Description:  Award of Contract for the Extension of Kainji 330KV Substation Construction of 1x150MVA 330/132KV Substation at Kainji &  Construction of 2x30/40MVA Substation at New Bussa in Kwara State and 2x60MVA/132/33KV S/S at Ayobo & Ikeja West- Ayobo 132 KV D/C Lines

Contractor/Consultant: Messrs. MBH Power Limited & Messrs LAGA/CE Power Solutions

Reviewed Project Cost (N):   6,844,940,892.94

 

7.3.) TCN Project Description:  Award of Contract for the Design, Engineering Design, Manufacture, Supply, Installation and Commissioning of Digital Communication Facilities in Transmission Substations – Lot 1 Fibre optics Transmission

Contractor/Consultant:   Messrs. Siemens Limited

Reviewed Project Cost (N):    244,058,052.51

 

7.4.) TCN Project Description:  Award of Contract for the Design, Engineering Design, Manufacture Supply, Installation and Commissioning of the Reinforcement of Birnin-Kebbi & Kano (Kumbotso) Transmission Substations (Lot 2008 – 7)

Contractor/Consultant:   Messrs. MBH Power Limited

Reviewed Project Cost (N):   3,000,357,392.62

 

7.5.) TCN Project Description:  Award of Contract for the Design, Manufacture, Supply, Installation and Commissioning of the Reinforcement of Afam TS with 1x150MVA, 330/132/33kV Transformer & Construction of Afam IV – Afam III Double Circuit 132kv Line – (Lot 2008-10)

Contractor/Consultant:  Messrs. Taleveras Group/UMEL Dalekomontaza

Reviewed Project Cost (N):   1,268,539,218.25

 

7.6.)TCN Project Description:  Award of Contract for the Design, Manufacture, Supply, Installation and Commissioning of Kainji – New Bussa 132kV Double Circuit Transmission Lines with 330kV Single Circuit River Crossing at Kainji under Lot 2008-3

Contractor/Consultant:  Messrs. Jaguar Overseas /Willands Engineering Limited

Reviewed Project Cost (N):   291,589,265.91

 

7.7.) TCN Project Description:  Award of Contract for Additional Works on the  Construction of 1x30/40MVA 132/33KV Substation at Amukpe (Sapele)

Contractor/Consultant:  Messrs. News Engineering Nigeria Limited

Reviewed Project Cost (N):   380,971,332.00

 

7.8.) TCN Project Description:  Award of Contract for onstruction of Ikorodu – Odogunyan Shagamu 132kv Double Circuit 

Contractor/Consultant:   Messrs. PPCL/Westcom Joint Venture

Reviewed Project Cost (N):   2,819,336,140.05


Total TCN Projects: 15,408,443,976.28