Posted by Kelvin on Mon 15th Oct, 2012 - nigeriantenders.com
FEDERAL EXECUTIVE COUNCIL (FEC) APPROVED CONTRACTS FOR NOVEMBER 24, 2010
1.) Contract Item/ Service: Award of Contract for the Construction of Katsina-KurfiDutsinma-Kankara-Malumfashi
132Kv Double-Circuit Transmission Line
Name of Company: Messrs. Skipper Electricals Limited
Implementing Agency:Transmission Company of Nigeria PLC (TCN)
Cost: USD12,432,396.06 Plus N1,313,315,898.75 inclusive of a Provisional Sum of N262,663,179.75 for Right of Way Compensation, 5% VAT onshore payments and 10%Contingency
Date: 24/11/10
Duration: 12 Months
2.) Contract Item/ Service: Award of Contract for the Design, Manufacture, Supply, Installation and Commissioning of 330/132KV Sub-Station at Katsina and Line Bay Extension at Kano
Name of Company:Messrs. Barme-ESL JV
Implementing Agency:Transmission Company of Nigeria PLC (TCN)
Cost: USD16,759,886.31 payable at prevailing exchange rate Plus N1,383,979,216.80 inclusive of a Provisional Sum of N444,568,552.80 for 5% VAT on onshore payments, Compensation and Contingency
Date: 24/11/10
Duration: 24 Months
3.) Contract Item/ Service: Award of Contract for the Rehabilitation of Gwagwalada-DobiIzom Road in the Federal Capital Territory
Name of Company:Messrs. Ndubueze Engineering (International)
Implementing Agency: Company Limited NEIC Federal Capital Territory
Cost: N1,611,691,830.00
Date: 24/11/10
Duration:12 Months
4.) Contract Item/ Service: Ratification of the Award of Contract for the Supply of 150,000 Units of Collapsible Transparent Ballot Boxes
Name of Company:Messrs. Emchai Limited
Implementing Agency: INEC
Cost: N1,950,000,000.00 @ N13,000.00 each
Date: 24/11/10
Duration:
5.) Contract Item/ Service: Award of Contract for Direct Procurement of 31No. FP5 Pothole Patchers
Name of Company:Messrs. Bergkamp Incoprporated USA
Implementing Agency: FERMA
Cost: N1,127,226,973.95
Date: 24/11/10
Duration: 12 Months
6.) Contract Item/ Service: Award of Contract for the Construction of Head Office Complex for the Economic and Financial Crimes Commission (EFCC)
Name of Company: Messrs. Julius Berger (Nigeria) Plc
Implementing Agency: EFCC
Cost: N18,867,283,615.14
Date: 24/11/10
Duration:38 Months
7.) Contract Item/ Service: Award of Contract for the Provision of Engineering Infrastructure to Plot1038 Extension, Cadastral Zone A05,Maitama District-Abuja
Name of Company:Messrs. Coan (W.A) Limited
Implementing Agency: Federal Capital Territory
Cost: N1,814,208,678.10
Date: 24/11/10
Duration: 18 Months
8.) Contract Item/ Service: Award of Contract for the Construction of 13km Road from Kuje to Gaube in FCT
Name of Company:Messrs. Ceezali Limited
Implementing Agency: Federal Capital Territory
Cost: N1,289,644,606.69
Date: 24/11/10
Duration: 9 Months
9.) Contract Item/ Service: Award of Contract for the an Environmental Impact Assessment Study of the 700MW Zungeru HydroElectric Power Project
Name of Company:Messrs. CES (Nigeria) Limited
Implementing Agency: Ministry of Power
Cost: N126,317,100.00
Date: 24/11/10
Duration: 12 Months
10.) Contract Item/ Service: Revision of the Contract Sum for the Supply of Spare Parts for Mark IV Control Panel for the Ughelli Power Plc
Name of Company: Messrs. Valenz Holding Limited
Implementing Agency: Ministry of Power
Cost: Revised Contract Sum From N95,272,800.00 To N114,579,479.52
Date: 24/11/10
Duration: 4 Months
11) Award of Contracts for the Construction of 3NO. 132KV Double Circuit Transmission Lines for the Transmission Company of Nigeria Plc (Ministry of Power)
11a) Lot No.: Lot 2010-5
Description: Award of Contract for Engineering, Procurement, Construction and Commissioning of the 173 km Katsina-Kurfi-Dutsinma-Kankara-Malumfashi 132Kv Double Circuit Transmission Line
Name of Company: Messrs. Skipper Electricals Ltd.
Cost: USD12,432,396.06 payable at prevailing exchange rate Plus N1,313,315,898.75 inclusive of a provisional sum N262,663,179.75 for Right of Way Compensation,5% VAT on onshore payments and 10% Contingency
Date: 24/11/10
Completion Period: 24 Months
11b) Lot No.: Lot 2010-6
Description:Award of Contract for Engineering, Procurement, Construction and Commissioning of the 60 km Daura-Dambatta 132Kv Double Circuit transmission line
Name of Company: Messrs. ICOMM TELE Ltd.
Cost: USD3,885,579.50 payable at prevailing rate of exchange Plus N203,160,503.02 for Right of Way Compensation,5% VAT on onshore payments and 10% Contingency
Date: 24/11/10
Completion Period:18 Months
11c) Lot No.: Lot 2010-10
Description: Award of Contract for Engineering, Procurement, Construction and Commissioning of the 45 km Ganmo-Ogbomosho 132kv Double Circuit Transmission line
Name of Company: Messrs. Trenco/Eco Energy Group Consortium
Cost: USD4,524,057.04 payable at prevailing rate of exchange Plus
N517,461,488.92 Inclusive of a provisional sum of N212,241,580.92 for Right of Way Compensation,5% VAT on onshore payments and 10% Contingency
Date: 24/11/10
Completion Period: 18 Months
12 Award of Contracts for the Supply of 2No. 150MVA 330/132/33KV, 6No. 100MVA 132/33KV And 10No. 60MVA 132/33KV Power Transformers for the Transmission Company of Nigeria Plc (Ministry of Power)
12a) Lot No.: Lot 2010-A1
Description: Award of Contract for Design, Manufacture and Supply of 2 Units of 150MVA 330/132/33KV Power Transformers Complete with Spare Parts and Accessories
Name of Company: Messrs. Hyosung Corporation
Cost: €1,751,746.00 Plus N51,622,875.55
Date: 24/11/10
Completion Period: 11 Months
12b) Lot No.: Lot 2010-A2
Description: Award of Contract for Design, Manufacture and Supply of 10 Units of 60MVA 132/33KV Power Transformers Complete with Spare Parts and Accessories
Name of Company: Messrs. Efacec Electrical Equipment Company Limited
Cost: USD5,569,500.00 Plus N173,544,506.10
Date: 24/11/10
Completion Period: 9 Months
12b) Lot No.: Lot 2010-A2
Description: Award of Contract for Design, Manufacture and Supply of 10 Units of 60MVA 132/33KV Power Transformers Complete with Spare Parts and Accessories
Name of Company: Messrs. Efacec Electrical Equipment Company Limited
Cost: USD5,569,500.00 Plus N173,544,506.10
Date: 24/11/10
Completion Period: 9 Months
12c) Lot No.: Lot 2010-2
Description: Award of Contract for Design, Manufacture and Supply of 6 units of 100MVA 132/33/KV Power Transformers Complete with Spare Parts and Accessories
Name of Company: Messrs. Shandong Power Equipment Company Limited
Cost: USD4,292,140.00 Plus N132,775,048.10
Date: 24/11/10
Completion Period: 8 Months