Federal Executive Council - FEC Approved Contracts For November 24, 2010

Posted by Kelvin on Mon 15th Oct, 2012 - nigeriantenders.com






FEDERAL EXECUTIVE COUNCIL (FEC) APPROVED CONTRACTS FOR NOVEMBER 24, 2010

1.)  Contract Item/ Service: Award of Contract for the Construction of Katsina-KurfiDutsinma-Kankara-Malumfashi
132Kv Double-Circuit Transmission Line

Name of Company:
Messrs. Skipper Electricals Limited

Implementing Agency:Transmission Company of Nigeria PLC (TCN)


Cost:
USD12,432,396.06 Plus N1,313,315,898.75 inclusive of a Provisional Sum of N262,663,179.75 for Right of Way Compensation, 5% VAT onshore payments and 10%Contingency

Date: 24/11/10


Duration:
12 Months

2.) Contract Item/ Service: Award of Contract for the Design, Manufacture, Supply, Installation and Commissioning of 330/132KV Sub-Station at Katsina and Line Bay Extension at Kano

Name of Company:
Messrs. Barme-ESL JV

Implementing Agency:Transmission Company of Nigeria PLC (TCN)


Cost:
USD16,759,886.31 payable at prevailing exchange rate Plus N1,383,979,216.80 inclusive of a Provisional Sum of N444,568,552.80 for 5% VAT on onshore payments, Compensation and Contingency

Date: 24/11/10

Duration:
24 Months


3.) Contract Item/ Service: Award of Contract for the Rehabilitation of Gwagwalada-DobiIzom Road in the Federal Capital Territory

Name of Company:
Messrs. Ndubueze Engineering (International)

Implementing Agency: Company Limited NEIC Federal Capital Territory


Cost:
N1,611,691,830.00

Date:  24/11/10

Duration:
12 Months

4.) Contract Item/ Service: Ratification of the Award of Contract for the Supply of 150,000 Units of Collapsible Transparent Ballot Boxes

Name of Company:
Messrs. Emchai Limited

Implementing Agency: INEC


Cost:
N1,950,000,000.00 @ N13,000.00 each

Date: 24/11/10

Duration:

5.) Contract Item/ Service:  Award of Contract for Direct Procurement of 31No. FP5 Pothole Patchers

Name of Company:
Messrs. Bergkamp Incoprporated USA

Implementing Agency: FERMA


Cost:
N1,127,226,973.95

Date:  24/11/10

Duration: 12 Months

6.) Contract Item/ Service: Award of Contract for the Construction of Head Office Complex for the Economic and Financial Crimes Commission (EFCC)

Name of Company:
Messrs. Julius Berger (Nigeria) Plc

Implementing Agency: EFCC


Cost:
N18,867,283,615.14

Date: 24/11/10

Duration:38 Months

7.) Contract Item/ Service: Award of Contract for the Provision of Engineering Infrastructure to Plot1038 Extension, Cadastral Zone A05,Maitama District-Abuja

Name of Company:
Messrs. Coan (W.A) Limited

Implementing Agency: Federal Capital Territory


Cost:
N1,814,208,678.10

Date: 24/11/10

Duration: 18 Months

8.) Contract Item/ Service: Award of Contract for the Construction of 13km Road from Kuje to Gaube in FCT

Name of Company:
Messrs. Ceezali Limited

Implementing Agency: Federal Capital Territory


Cost:
N1,289,644,606.69

Date: 24/11/10

Duration: 9 Months

9.) Contract Item/ Service: Award of Contract for the an Environmental Impact Assessment Study of the 700MW Zungeru HydroElectric Power Project

Name of Company:
Messrs. CES (Nigeria) Limited

Implementing Agency: Ministry of Power

Cost: N126,317,100.00

Date: 24/11/10

Duration: 12 Months

10.) Contract Item/ Service: Revision of the Contract Sum for the Supply of Spare Parts for Mark IV Control Panel for the Ughelli Power Plc

Name of Company:
Messrs. Valenz Holding Limited

Implementing Agency: Ministry of Power

Cost: Revised Contract Sum From N95,272,800.00 To N114,579,479.52

Date: 24/11/10

Duration: 4 Months

11) Award of Contracts for the Construction of 3NO. 132KV Double Circuit Transmission Lines for the Transmission Company of Nigeria Plc (Ministry of Power)

11a) Lot No.:  Lot 2010-5

Description:
Award of Contract for Engineering, Procurement, Construction and Commissioning of the  173 km Katsina-Kurfi-Dutsinma-Kankara-Malumfashi 132Kv Double Circuit Transmission Line

Name of Company:
Messrs. Skipper Electricals Ltd.

Cost:
USD12,432,396.06 payable at prevailing exchange rate Plus N1,313,315,898.75 inclusive of a provisional sum N262,663,179.75 for Right of Way Compensation,5% VAT on onshore payments and 10% Contingency

Date:
24/11/10

Completion  Period:
24 Months

11b) Lot No.: Lot 2010-6

Description:
Award of Contract for Engineering, Procurement, Construction and Commissioning of the 60 km Daura-Dambatta 132Kv Double Circuit transmission line

Name of Company:
Messrs. ICOMM TELE Ltd.

Cost:
USD3,885,579.50 payable at prevailing rate of exchange Plus N203,160,503.02 for Right of Way Compensation,5% VAT on onshore payments and 10% Contingency

Date:
24/11/10

Completion  Period:
18 Months

11c) Lot No.: Lot 2010-10

Description:
Award of Contract for Engineering, Procurement, Construction and Commissioning of the 45 km Ganmo-Ogbomosho 132kv Double Circuit Transmission line

Name of Company:
Messrs. Trenco/Eco Energy Group Consortium

Cost:
USD4,524,057.04 payable at prevailing rate of exchange Plus
N517,461,488.92 Inclusive of a provisional sum of N212,241,580.92 for Right of Way Compensation,5% VAT on onshore payments and 10% Contingency

Date:
24/11/10

Completion  Period:
18 Months

12 Award of Contracts for the Supply of 2No. 150MVA 330/132/33KV, 6No. 100MVA  132/33KV And 10No. 60MVA 132/33KV Power Transformers for the Transmission Company of Nigeria Plc (Ministry of Power)

12a) Lot No.: Lot 2010-A1

Description:
Award of Contract for Design, Manufacture and Supply of 2 Units of 150MVA 330/132/33KV Power Transformers Complete with Spare Parts and Accessories

Name of Company:
Messrs. Hyosung Corporation

Cost:
€1,751,746.00 Plus N51,622,875.55

Date:
24/11/10

Completion  Period:
11 Months

12b) Lot No.: Lot 2010-A2

Description:
Award of Contract for Design, Manufacture and Supply of 10 Units of 60MVA 132/33KV Power Transformers Complete with Spare Parts and Accessories

Name of Company:
Messrs. Efacec Electrical Equipment Company Limited

Cost:
USD5,569,500.00 Plus N173,544,506.10

Date:
24/11/10

Completion  Period:
9 Months

12b) Lot No.: Lot 2010-A2

Description:
Award of Contract for Design, Manufacture and Supply of 10 Units of 60MVA 132/33KV Power Transformers Complete with Spare Parts and Accessories

Name of Company:
Messrs. Efacec Electrical Equipment Company Limited

Cost:
USD5,569,500.00 Plus N173,544,506.10

Date:
24/11/10

Completion  Period:
9 Months

12c)
Lot No.: Lot 2010-2

Description:
Award of Contract for Design, Manufacture and Supply of 6 units of 100MVA 132/33/KV Power Transformers Complete with Spare Parts and Accessories

Name of Company:
Messrs. Shandong Power Equipment Company Limited

Cost:
USD4,292,140.00 Plus N132,775,048.10

Date:
24/11/10

Completion  Period:
8 Months