Federal Executive Council - FEC Approved Contracts For November 10, 2010

Posted by Kelvin on Tue 16th Oct, 2012 - nigeriantenders.com






FEDERAL EXECUTIVE COUNCIL (FEC) APPROVED CONTRACTS FOR NOVEMBER 10, 2010

1.) RATIFICATION OF THE APPROVAL FOR THE AWARD OF CONTRACTS FOR THE ACQUISITION OF DIRECT DATA CAPTURE MACHINES FOR NATION WIDE VOTERS’ REGISTRATION EXERCISE BY INEC

1a) Contractor: Messrs. Zinox Technology (Nigeria) Limited

Quantity:
80,000 Units

Unit Price:
USD1,771.73

Total Cost:
USD141,738,400.00 Payable at the prevailing exchange rate at the time of payment

Completion Period:
8 Weeks

1b) Contractor: Messrs. Haier Electrical Appliance

Quantity:
30,000 Units

Unit Price:
USD1,699.60

Total Cost:
USD50,988,000.00 Payable at the prevailing exchange rate at the time of payment

Completion Period:
8 Weeks

1c) Contractor: Messrs. Avante International Technology, Inc.,

Quantity:
22,000 Units

Unit Price:
USD1,699.60

Total Cost:
USD37,391,200.00 Payable at the prevailing exchange rate at the time of payment

Completion Period:
8 Weeks

TOTAL  

Quantity: 132,000 Units

Total Cost: USD 230,117,600.00

2) Contract Item/ Service: Award of Contract for the Construction of 31Km Alode – Onne (Oil and Gas Free Zone) – Afam – Oyigbo – Imo River Bridge (along Aba – PH Expressway) Road in Rivers State

Name of Company: Messrs. Hinterland(Nigeria) Limited

Implementing Agency:
Ministry of Niger Delta Affairs

Cost:
N17,440,499,659.52

Date:
10/11/10

Duration:
24 Months

3) Contract Item/ Service: Award of Contract for the Completion of all Outstanding Works at the Maiduguri 1 x 150MVA 330/132KV Substation Project

Name of Company: Messrs. Best & Crompton Engineering (Africa) Limited

Implementing Agency:
Ministry of Power/ TCN

Cost:
USD2,067,346.67 Plus N911,669,400.00 inclusive of a provision of N118,913,400.00, 5% VAT on on-shore
payments and 10% Contingency

Date:
10/11/10

Duration:
18 Months

4.) CONTRACTS FOR LAND RECLAMATION AND EROSION CONTROL PROJECTS IN ABIA AND AKWA-IBOM STAT

4a) Contract Item/ Service: Award of Contract for the Land Reclamation and Erosion Control at Ogudu Asa Phase I, Isukwuato LGA,Abia State

Name of Company: Messrs. Deeporange Nigeria Ltd

Implementing Agency:
Ministry of Niger Delta Affairs

Cost:
N2,260,620,948.60

Date:
10/11/10

Duration:
24 Months

4b) Contract Item/ Service: Award of Contract for the Land Reclamation and Erosion Control at Ibakang Nssit – Ikot Ekpo – Unyehe Road,Nsit Attai LGA Akwa Ibom State

Name of Company: Messrs. Apogee Engineering Limited

Implementing Agency:
Ministry of Niger Delta Affairs

Cost:
N1,473,625,392.75

Date:
10/11/10

Duration:
12 Months

5) AWARD OF CONTRACTS FOR THE PRINTING AND DISTRIBUTION OF ENGLISH LANGUAGE,MATHEMATICS AND SCIENCE-BASED ACTIVITY BOOKS FOR PRIMARY THREE(3) AND ASSORTED LIBRARY BOOKS (MATERIALS) FOR THE JUNIOR SECONDARY SCHOOLS (JSS) IN NIGERIAN PUBLIC SCHOOLS BY THE UNIVERSAL BASIC EDUCATION COMMISSION(UBEC) WITH A COMPLETION PERIOD OF SIX WEEKS

i) Description of Project:
Printing and Distribution of Macmillan New Pry.Maths Book 3 for 12 States


Publisher/ Contractor:
Macmillan

Quantity:
1,200,000


Total Cost(N):
540,000,000.00

ii) Description of Project: Printing and Distribution of Macmillan New Pry.Eng.Lang. Book 3 for 12 States

Publisher/ Contractor:
Macmillan

Quantity:
1,200,000

Total Cost(N):
480,000,000.00

iii) Description of Project: Printing and Distribution of Think and Do: Activity Based Science Book for Pry.3 for 29 States

Publisher/ Contractor:
Macmillan

Quantity:
2,465,000

Total Cost(N):
961,350,000.00

iv) Description of Project: Printing and Distribution of 143 Assorted titles of Library Resource Materials for 36 States and the FCT

Publisher/ Contractor:
Macmillan

Quantity:
1,322,370

Total Cost(N):
548,686,875.00

v) Description of Project: Printing and Distribution of Longman New Method Maths. Book 3 for 5 States

Publisher/ Contractor:
Longman Nig. Plc

Quantity:
500,000

Total Cost(N):
240,000,000.00

vi) Description of Project: Printing and Distribution of Longman Nig.Pry.Eng.Book 3 for 5 States

Publisher/ Contractor:
Longman Nigeria Plc

Quantity:
500,000

Total Cost(N):
225,000,000.00

vii) Description of Project: Printing and Distribution of 54 Assorted titles of Library Resource Materials for 36 States and the FCT

Publisher/ Contractor:
Evans Brothers

Quantity:
499,500

Total Cost(N):
147,722,500.00

viii) Description of Project: Printing and Distribution of Heinemann Prime Maths.Book 3 for 2 States

Publisher/ Contractor:
HEBN Publishers

Quantity:
200,000

Total Cost(N):
100,000,000.00

ix) Description of Project:Printing and Distribution of Tanus Pry.Maths.Book 3 for 3 States

Publisher/ Contractor:
Tanus Comm. Ltd.

Quantity:
300,000

Total Cost(N):
135,000,000.00

x) Description of Project:Printing and Distribution of Tanus Pry.Eng.Book 3 for 3 States

Publisher/ Contractor:
Tanus Co. Ltd.,

Quantity:
300,000

Total Cost(N):
135,000,000.00

xi) Description of Project: Printing and Distribution of UPE Plc.Pry.Maths. Book for 2 States

Publisher/ Contractor:
University Publishers Plc

Quantity:
200,000

Total Cost(N):
104,000,000.00

xii) Description of Project: Printing and Distribution of West African Learn Maths.Book 3 for 2 States

Publisher/ Contractor:
West African Books  Publishers

Quantity:
200,000

Total Cost(N):
102,000,000.00

xiii) Description of Project: Printing and Distribution of West African Learn Eng.Book 3 for 2 States

Publisher/ Contractor:
West Afriican Books Publishers

Quantity:
200,000

Total Cost(N):
100,000,000.00

xiv) Description of Project: Printing and Distribution of Real Integrated Maths.Book for 8 States

Publisher/ Contractor:
Real Integrated

Quantity:
800,000

Total Cost(N):
400,000,000.00

xv) Description of Project: Printing and Distribution of Real Integrated Maths.Book for 8 States

Publisher/ Contractor:
Real Integrated

Quantity:
800,000

Total Cost(N):
360,000,000.00

xvi) Description of Project: Printing and Distribution of Science and Technology Books Real Integrated Books for 8 states

Publisher/ Contractor:
Real Integrated

Quantity:
680,000

Total Cost(N):
265,200,000.00

xvii) Description of Project: Printing and Distribution of 134 Assorted titles of Library Resource Materials for 36 States and the FCT  

Publisher/ Contractor:
Real Integrated

Quantity:
2,479,000

Total Cost(N):
1,115,550,000.00

TOTAL
N 5,959,509,375.00

6) CONTRACTS FOR THE SUPPLY AND DISTRIBUTION OF 6,394,267 UNITS OF MDG-DRG BRANDED LONG LASTING INSECTICIDAL NETS (LLIN) TO 15 SENATORIAL DISTRICTS IN 5 STATES WITH NET GAPS WITH A DELIVERY PERIOD OF 90 DAYS (MINISTRY OF HEALTH)


i) Lot: 1

Description of Project:
Supply of 447,417 Units of (MDG-DRG Branded) Long Lasting Insecticidal Nets (Rectangular), 70% Polyethylene,30% polyester,50% white,25% Blue and 25% Green to Okpe LGA,Delta State

Publisher/ Contractor:
Messrs. Freedeals (Nig.) Ltd.,

Quantity:
447,417 1,082.00

Total Cost(N):
484,105,194.00

ii) Lot: 2

Description of Project:
Supply of 458,944 Units of (MDG-DRG Branded) Long Lasting Insecticidal Nets (Rectangular), 70% Polyethylene,30% polyester,50% white,25% Blue and 25% Green to Ika LGA,Delta State

Publisher/ Contractor:
Messrs. Alirezi (Nig.) Ltd.,

Quantity:
458,944 1,082.00

Total Cost(N):
496,577,408.00

iii) Lot: 3

Description of Project:
Supply of 417,740 Units of (MDG-DRG Branded) Long Lasting Insecticidal Nets (Rectangular), 70% Polyethylene,30% polyester,50% white,25% Blue and 25% Green to Warri South LGA,Delta State

Publisher/ Contractor:
Messrs. Rossies Textile Mil Ltd.,

Quantity:
417,740 1,082.00

Total Cost(N):
451,994,680.00

iv) Lot: 4

Description of Project:
Supply of 470,425 Units of (MDG-DRG Branded) Long Lasting Insecticidal Nets (Rectangular), 70% Polyethylene,30% polyester,50% white,25% Blue and 25% Green to Anyigba,Dekina,Kogi State

Publisher/ Contractor:
Messrs. Jols and Associates

Quantity:
470,425 1,082.00

Total Cost(N):
508,999,850.00

v) Lot: 5

Description of Project:
Supply of 288,321 Units of (MDG-DRG Branded) Long Lasting Insecticidal Nets (Rectangular), 70% Polyethylene,30% polyester,50% white,25% Blue and 25% Green to Lokoja,Kogi State

Publisher/ Contractor:
Messrs. AP &E Ajaru Ltd.,

Quantity:
288,321 1,082.00

Total Cost(N):
311,963,,322.00

vi) Lot: 6

Description of Project:
Supply of 280,286 Units of (MDG-DRG Branded) Long Lasting Insecticidal Nets(Rectangular), 70% Polyethylene,30% polyester,50% white,25% Blue and 25% Green to Okene,Kogi State

Publisher/ Contractor:
Messrs. Springfield Agro Ltd.,

Quantity:
280,286 1,082.00

Total Cost(N):
303,269,452.00

vii) Lot: 7

Description of Project:
Supply of 339,551 Units of (MDG-DRG Branded) Long Lasting Insecticidal Nets(Rectangular), 70% Polyethylene,30% polyester,50% white,25% Blue and 25% Green to Oshogbo, Oyo State

Publisher/ Contractor:
Messrs. Biostadt

Quantity:
339,551 1,082.00

Total Cost(N):
367,394,182.00

viii) Lot: 8

Description of Project:
Supply of 408,550 Units of (MDG-DRG Branded) Long Lasting Insecticidal Nets (Rectangular), 70% Polyethylene,30% polyester,50% white,25% Blue and 25% Green to Ile-Ife,Osun State

Publisher/ Contractor:
Messrs. Harvestfield Industries Ltd.,

Quantity:
408,550 1,082.00

Total Cost(N):
442,051,100.00

xix) Lot: 9

Description of Project:
Supply of 357,969 Units of (MDG-DRG Branded) Long Lasting Insecticidal Nets (Rectangular), 70% Polyethylene,30% polyester,50% white,25% Blue and 25% Green to Iwo,Osun State

Publisher/ Contractor:
Messrs. Anthrimacx Ltd.,

Quantity:
357,969 1,082.00

Total Cost(N):
387,322,458.00

x) Lot: 10

Description of Project:
Supply of 613,258 Units of (MDG-DRG Branded) Long Lasting Insecticidal Nets (Rectangular), 70% Polyethylene,30% polyester,50% white,25% Blue and 25% Green to Ona-Ora,Oyo State

Publisher/ Contractor:
Messrs. Dan Clinton (Nig.) Ltd.,

Quantity:
613,258 1,082.00

Total Cost(N):
663,545,156.00

xi) Lot: 11

Description of Project:
Supply of 635,293 Units of (MDG-DRG Branded) Long Lasting Insecticidal Nets (Rectangular), 70% Polyethylene,30% polyester,50% white,25% Blue and 25% Green to Ogbomosho North LGA,Oyo State

Publisher/ Contractor:
Messrs. Zaina (Nig.) Ltd.,

Quantity:
635,293 1,082.00

Total Cost(N):
687,387,026.00

xii) Lot: 12

Description of Project:
Supply of 575,524 Units of (MDG-DRG Branded) Long Lasting Insecticidal Nets (Rectangular), 70% Polyethylene,30% polyester,50% white,25% Blue and 25% Green to Ibadan South West LGA,Oyo State

Publisher/ Contractor:
Messrs. Patem Global Ltd.,

Quantity:
575,524 1,082.00

Total Cost(N):
622,716,968.00

xiii) Lot:
13

Description of Project:
Supply of 392,765 Units of (MDG-DRG Branded) Long Lasting Insecticidal Nets (Rectangular), 70% Polyethylene,30% Green to Okitipupa LGA,Ondo State

Publisher/ Contractor:
Messrs. Grace D.Lab  Diagnostic (Nig.) Ltd.,

Quantity:
392,765 1,082.00

Total Cost(N):
424,971,730.00

xiv) Lot: 14

Description of Project:
Supply of 367,499 Units of (MDG-DRG Branded) Long Lasting Insecticidal Nets (Rectangular), 70% Polyethylene,30% polyester,50% white,25% Blue and 25% Green to Akure LGA,Ondo State

Publisher/ Contractor:
Messrs. Afcott (Nig.) Ltd.,

Quantity:
367,499 1,082.00

Total Cost(N):
397,633,918.00

xv) Lot:15

Description of Project:
Supply of 340,725 Units of (MDG-DRG Branded) Long Lasting Insecticidal Nets (Rectangular), 70% Polyethylene,30% polyester,50% white,25% Blue and 25% Green to Oka LGA,Ondo State

Publisher/ Contractor:
Messrs. Cotsyn (Nig.) Ltd.,

Quantity:
340,725 1,082.00

Total Cost(N):
368,664,450.00

TOTAL

Quantity:6,394,267

Total Cost(N):
6,918,596,894.00

7) AWARD OF CONTRACTS FOR THE SUPPLY OF FIVE(5) DIFFERENT ANTI-RETROVIRAL (ARV) DRUGS TO THE FEDERAL MINISTRY OF HEALTH WITHIN THE DELIVERY PERIOD OF 8 WEEKS

7a) Description:
Contract for the Supply of 10,000 Packs of Tenoforvir (30’s)

Contractor:
Messrs. Abson Pharmacy Stores

Quantity:
10,000

Unit Price(N):
3,150.00

Total Sum(N):
31,500,000.00

7b) Description: Contract for the Supply of 200,000 Packs of Zidovudine/Lamivudine (60’s)

Contractor:
Messrs. Ranbaxy (Nig.)

Quantity:
200,000

Unit Price(N):
1,352.00

Total Sum(N):
270,400,000.00

7c) Description: Contract for the Supply of 371,091 Packs of Zidovudine/Lamivudine/Nevirapine (60’s)

Contractor:
Messrs. Emcure (Nig.) Ltd.,

Quantity:
371,091

Unit Price(N):
1,629.00

Total Sum(N):
604,507,239.00

7d) Description:
Contract for the Supply of 247,000 Packs of Efavirenz (30’s)

Contractor:
Messrs. Strides Vital (Nig.) Ltd.,

Quantity:
247,000

Unit Price(N):
850.00

Total Sum(N):
209,950,000.00

7e) Description: Contract for the Supply of 300,000 Nevirapine (60’s)

Contractor:
Messrs. Pezzoshed

Quantity:
300,000

Unit Price(N):
676.20

Total Sum(N):
202,860,000.00

TOTAL 1,319,217,239.00

8) AWARD OF CONTRACTS FOR CONSULTANCY SERVICES FOR THE PRE- FEASIBILITY/FEASIBILITY AND PRELIMINARY/FINAL ENGINEERING DESIGNS FOR THE NIGER DELTA COASTAL HIGHWAY WITH A COMPLETION PERIOD OF 12 MONTHS (MINISTRY OF NIGER DELTA AFFAIRS)

8a) Lot No.:1

Description:
Ibaka/Oron (Cross River) to Ikot Abasi (Akwa Ibom)

Consultants:
Messrs. Aim Consultants Limited

BPP’s Reviewed Amount (N) :
1,080,434,893:64

Final BPP Reviewed Cost ( Taxes Inclusive)(N):
1,200,434,893:64

8b) Lot No.: 2

Description:
Ikot Abasi (Akwa Ibom) State Boundary) to Kula (Rivers)

Consultants:
Messrs. Worley Parsons Resources/Delta Afrik

BPP’s Reviewed Amount (N) :
1,155,531,205:35

Final BPP Reviewed Cost ( Taxes Inclusive)(N):
1,275,531,205:35

8c) Lot No.: 3

Description:
Kula (Rivers) to Akassa (Bayelsa)

Consultants:
Messrs. Ove Arup  &Partners (Nig.) Ltd.,

BPP’s Reviewed Amount (N) :
1,055,663,076:37

Final BPP Reviewed Cost ( Taxes Inclusive)(N):
1,175,663,076:37

8d) Lot No.: 4

Description:
Akassa (Bayelsa State Boundary) to Forcados (Delta)

Consultants:
Messrs. Srei Infrastructure finance Ltd.,/TDCI

BPP’s Reviewed Amount (N) :
1,549,641,330:00

Final BPP Reviewed Cost ( Taxes Inclusive)(N):
1,669,641,330:00

8e) Lot No.: 5

Description:
Forcados (Delta) to Delta/Ondo State Boundary

Consultants:
Messrs. Siraj Consulting Engineers/Nathan Associates Inc.

BPP’s Reviewed Amount (N) :
1,058,953,409:80

Final BPP Reviewed Cost ( Taxes Inclusive)(N):
1,178,953,409:80

8f) Lot No.: 6

Description: Delta/Ondo States Boundary to Awoye to Aiyetoro to Araromi to Epe

Consultants:
Messrs. Siraj Consulting Engineers/Nathan Associates Inc.

BPP’s Reviewed Amount (N) :
1,118300,139:60

Final BPP Reviewed Cost ( Taxes Inclusive)(N):
1,238,300,139:60

GRAND TOTAL

BPP’s Reviewed Amount (N) : 
7,018,524,054.76

Final BPP Reviewed Cost ( Taxes Inclusive)(N): 7,738,524,054.76

9) AWARD OF CONTRACTS FOR THE SUPPLY OF 1NO 150MVA 330/132/33KV POWER TRANSFORMER, 1NO 75MVAR SHUNT REACTOR & 8NO MOBILE TRANSFORMER OIL FILTRATION MACHINES FOR THE TRANSMISSION COMPANY OF NIGERIA PLC

9a) Lot No.:
Lot 2010-A1

Item/ Service:
Design, Manufacture and Supply of one Unit of 150MVA 330/132/33Kv Power Transformer Complete with Spare parts and Accessories

Name of Company:
Messrs. Hyosung Corporation

Implementing Agency:
Ministry of Power

Cost:
€932,546.00 payable at the prevailing exchange rate at the time of payment Plus N27,481,556.17

Date: 
10/11/10

Duration:
11 Months

9b) Lot No.: Lot 2010-B1

Item/ Service:
Design, Manufacture and Supply of one Unit of 75MVAR 330Kv Shunt Reactor Complete with Spare Parts and Accessories

Name of Company:
Messrs. Hyosung Corporation

Implementing Agency:
Ministry of Power

Cost:
€691,755.00 Plus N20,385,593.73

Date: 
10/11/10

Duration:
11 Months

9c) Lot No.: Lot 2010-B2

Item/ Service:
Design, Manufacture and Supply of 8No. Mobile Transformer Oil Filtration Machines Complete with Spare Parts

Name of Company:
Messrs. Globe Core Limited

Implementing Agency:
Ministry of Power

Cost:
€552,264.49 Plus N16,274,894.35

Date: 
10/11/10

Duration:
12 Weeks

10) AWARD OF CONTRACT FOR THE DESIGN, MANUFACTURE, SUPPLY, INSTALLATION AND COMMISSIONING OF 3NO. TRANSMISSION SUB-STATIONS FOR THE TRANSMISSION COMPANY OF NIGERIA PLC


10a) Lot No.: Lot 2010-19

Item/ Service:
Design, Manufacture, Supply, Installation and Commissioning of 2 x 150MVA,330/132KV plus 2 x 60MVA,132/33KV Substation with 6 x 330KV Line Bays at Omotosho Substation

Name of Company:
Messrs. AK-AY Elektrik

Implementing Agency:
Ministry of Power

Cost:
USD17,124,086.02 Plus N1,393,876,241.27 inclusive of a provisional sum of N451,371,472.27, for 5% VAT on onshore payments,compensation and Contingency

Date: 
10/11/10

Duration:
24 Months

10b) Lot No.:Lot 2010-29

Item/ Service:
Design, Manufacture, Supply, Installation and Commissioning of 2 x 60MVA,132/33KV Substation at Shonga,and 2 x 132KV Line Bay Extensions at Ganmo Substation

Name of Company:
Messrs. Rhuoga Energy/New World

Implementing Agency:
Ministry of Power

Cost:
€5,667,766.53 Plus N615,436,299.71 inclusive of aprovisional sum of N195,444,143.74,for 5% VAT on onshore payments,Compensation and Contingency

Date: 
10/11/10

Duration:
24 Months

10c) Lot No.: Lot 2010-30

Item/ Service:
Design, Manufacture, Supply, Installation and Commissioning of 2 x 60MVA,132/33KV Substation at Ede,with 2 x 132KV Line Bay Extensions at Osogbo

Name of Company:
Messrs. Cobra – Sigba Joint Venture

Implementing Agency:
Ministry of Power

Cost:
USD7,730,072.00 Plus N591,650,181.17, inclusive of a provisional sum of N199,309,141.17, for 5% VAT on onshore payments,Compensation and Contingency

Date: 
10/11/10

Duration:
24 Months

11) Item/ Service: Revised Estimated Total Cost (RETC) for the Rehabilitation of Lower Anambra Irrigation Project

Name of Company:
Messrs. Hydroworks(Nigeria) Limited

Implementing Agency:
Ministry of Water Resources

Cost: Revised Contract Sum From N1,022,710,463.78 To N1,724,591,189.00

Date: 
10/11/10

Duration:
Extended to June,2011

12) Item/ Service: Augmentation of the Estimated Total Cost( ETC) for the Completion of the Construction of the Owiwi Dam Project and Associated Works including Water Treatment Plant and Irrigation Schemes

Name of Company:
Messrs. Gilmor Engineering (Nigeria) Limited

Implementing Agency:
Ministry of Water Resources

Cost:
Revised Contract Sum From N6,836,623,887.05 To N9,755,826,596.30

Date: 
10/11/10

Duration:
Extended to July,2011

13) Item/ Service: Augmentation of Contract NO.6037 for the Rehabilitation of Oji-AchiMmaku-Awgu-Ndeabor-MpuOkpanku-Akaeze road, Section I, in Enugu State

Name of Company:
Messrs. Master Holdings (Nigeria) limited

Implementing Agency:
Ministry of Works  

Cost:
Revised Contract Sum From N3,287,120,702.25 To N4,805,288,034.75

Date: 
10/11/10

Duration:
18 Months

14) Item/ Service: Augmentation of Contract for the Rehabilitation of the Additional 3km (km 0+000 ton km 3+ 00) as Addendum to the Subsisting Contract for the Rehabilitation of Enugu Bound Dual Carriageway Road (Phase I of Section I) in Anambra State

Name of Company:
Messrs. CCC (Nigeria)Limited

Implementing Agency:
Ministry of Works

Cost:
Revised Contract Sum From N5,092,444,641.90k To N7,351,344,974.40k

Date: 
10/11/10

Duration:
30 Months

15) Item/ Service: Augmentation of Contract No.6024 for the Completion of Rehabilitation  of Otuocha-Anam-Nzam-InnomaIheaka-Ibaji Section of Otuocha-IbajiOdulu-Ajegwu Road in Anambra State

Name of Company:
Messrs. Niger Construction Ltd.,

Implementing Agency:
Ministry of Works

Cost:
Revised Contract Sum FromN5,804,811,747.04k To N7,173,909,755.40k

Date: 
10/11/10

Duration:


16a) Item/ Service: Contract for the Rehabilitation of Apapa-Oshodi Expressway Section I: Km.7 + 000 (Beachland Junction) to Km.12 + 600 RHS in Lagos State

Name of Company:
Julius Berger (Nigeria) Plc.

Implementing Agency:
Ministry of Works

Cost:
N6241,059,730.33k

Date: 
10/11/10

Duration:
12 Months

16b) Item/ Service: Contract for the Rehabilitation of Oshogbo-Ilesha Road Section I: Ilesha-Oshogbo (Km.0 + 000 to Km.28 + 700) in Osun State

Name of Company:
Horizon Construction Company Limited

Implementing Agency:
Ministry of Works

Cost:
N2,693,245,401.00k

Date: 
10/11/10

Duration:
15 Months

17) CONTRACTS (8) FOR THE CONSTRUCTION AND REHABILITATION OF FEDERAL ROADS AND BRIDGES IN THE NORTH-CENTRAL, SOUTH-EAST, SOUTH-SOUTH AND SOUTH-WEST GEO-POLITICAL ZONES BY FEDERAL MINISTRY OF WORKS

NOTH- CENTRAL ZONE

a) Item/ Service:Rehabilitation of Otukpa Oweto Road in Benue State

Name of Company: Messrs. CGC (Nigeria) Limited

Cost:
N4,645,813,565.45

Implementing Agency:
Ministry of Woks

Duration:18 Months

b) Item/ Service:Dualisation of Suleja-Minna Road in Niger State

Name of Company: Messrs. Salini (Nigeria) Limited

Cost: 
N9,951,051,335.18

Implementing Agency:
Ministry of Works

Duration: 30 Months

c)  SOUTH -EAST ZONE

Item/ Service: Rehabilitation of OzallaAkpugo-AmagunzeIhuokpara-Nkomoro-IsuOnicha (Enugu-Onicha) Road, with a spur to Onunwere in Enugu State

Name of Company: Messrs. Arab Contractors Limited

Cost:
N6,796,939,488.99

Implementing Agency:
Ministry of Works

Duration:22 Months

f) SOUTH -WEST ZONE


Item/ Service: Dualisation of Ibadan Road (Mayfair Junction)-LagereIremo-Enuwa-Ilesha Bypass in Oyo State

Name of Company: Messrs. Kopek Construction Limited

Cost:
N6,718,498,984.54

Implementing Agency:
Ministry of Works

Duration:36 Months

g) Item/ Service:Dualisation of AbeokutaIbadan Road in Ogun/Oyo States

Name of Company: Messrs. Kopek Construction Limited

Cost:
N3,993,183,607.88

Implementing Agency:
Ministry of Works

Duration:15 Months

h) Item/ Service: Dualisation of Ijebu OdeIbadan Road Phase I: Rehabilitation of Ijebu OdeMamu Oyo S/B Road In Ogun State

Name of Company: Messrs. CCECC (Nigeria) Limited

Cost:
N1,696,337,058.26

Implementing Agency:
Ministry of Works

Duration:15 Months

TOTAL
N41,975,045,347.99

Industry

;
Category

;
State

;