FEDERAL EXECUTIVE COUNCIL (FEC) APPROVED CONTRACTS FOR DECEMBER 1, 2010

1) Item/Service: Award of Contract for the Construction of Outer Northern Express Way (ONEX) – Bwari Road in the Federal Capital Territory
Name of Company: Messrs. Parsons Science Engineering Company Limited
Implementing Agency: Federal Capital Territory
Cost: N2,071,002,504.83
Date: 01/12/10
Duration: 24 Months

2) Item/Service: Award of Contract for the Phase I of the Provision of infrastructure to Apo Estate Layout
Name of Company: Messrs. CAT Construction Group Limited
Implementing Agency: Federal Capital Territory
Cost: N2,919,952,518.53 out of the Total Project Sum of N5,754,722,480.33
Date: 01/12/10
Duration: 30 Months

3) Item/Service: Award of Contracts for the Phase I of the Construction of Southern Parkway from Christian Centre (S8/9) to Ring Road I, Abuja
Name of Company: Messrs. Setraco (Nigeria) Limited
Implementing Agency: Federal Capital Territory
Cost: N5,333,327,967.71 (Out of the Total Project Cost of N16,234,553,335.61)
Date: 01/12/10
Duration: 30 Months

4) Item/Service: Award of Contract for the implementation of Phase II of the Integrated Payroll and personnel Information System (IPPIS)
Name of Company: Messrs. Soft Alliance Limited
Implementing Agency: Ministry of Finance
Cost: N2,111,569,453.22, N233,571,819.53 (Annual payment for software licenses/support services
Date: 01/12/10
Duration: 6 Months

5) Item/Service: Award of Contract for the Construction of 35km Okputuite – Mbato Junction – Orie Market – Lomara (Igwebuike) Road in Umunneochi Local Government Area of Abia State
Name of Company: Messrs. Enerco (Nigeria) Limited
Implementing Agency: Ministry of Niger Delta Affairs
Cost: N9,008,332,927.96
Date: 01/12/10
Duration: 30 Months

 
6) Item/Service: Award of Contract for the Supply and Installation of Aerial Surveillance Equipment on Board Nigeria Immigration Service’s Air Border Patrol Aircraft Dornier 228 No 5N – Auz
Name of Company: Messrs. Africa Contracts and Equipment Limited
Implementing Agency: Nigeria immigration Services
Cost: N519,962,557.00
Date: 01/12/10
Duration: 9 Months

7) Item/Service: Award of Contract for the Engineering, Design, Manufacture, Procurement, Supply, Construction and Commissioning of the 12.4km Katampe – National Stadium 132kv Double - Circuit Transmission Line
Name of Company: Messrs. Energo (Nigeria) Limited
Implementing Agency: Ministry of Power
Cost: €8,248,200.53 payable at prevailing exchange rate Plus N888,572,930.35 inclusive of a provisional sum of N365,853,255.35 for Right of Way, compensation, 5% VAT on onshore payments and 10% Contingency
Date: 01/12/10
Duration: 18 Months

8) Item/Service: Award of Contract for the provision of Aviation Services for Transmission Line Survey and Digital Mapping for the Transmission Company of Nigeria (TCN) Plc
Name of Company: Messrs. Penuel Consulting LLC
Implementing Agency: TCN
Cost: USD3,639,034.12 payable at the prevailing exchange rate
Date: 01/12/10
Duration: 18 Months

9) Award of contracts for the Construction of Ogriagbene Road, Orhorho-Odorubu-Kpakiama-Bomadi Road in Delta State, Omelema-Agada 2 Road in Rivers State, Re-construction of Benin-Abraka Road in Edo State and Rehabilitation of Okpuala-Igwurunta Road in Imo/Rivers State ( Ministry of Niger Delta Affairs)

9a) Project Description: Ogriagbene – Torugbene Road
Name of Contractor: Messrs. SETRACO (Nig) Ltd.
Contract Sum for Phase I (N): 12,874,905,169.03
Completion Period (Prorated): 24 Months
Length (km): 11.525

9b) Project Description: Re-construction of Benin – Abraka Road
Name of Contractor: Messrs. REYNOLDS Construction Ltd.
Contract Sum for Phase I (N): 9,750,442,346.67
Completion Period (Prorated): 12 Months
Length (km): 28.950

9c) Project Description: Orhorho Junction – Odorubu – Kpakiama – Bomadi Road
Name of Contractor: Messrs. SETRACO (Nig) Ltd.
Contract Sum for Phase I (N): 9,635,337,763.76
Completion Period (Prorated): 18 Months
Length (km): 18.820

9d) Project Description: Omelema – Agada 2 Road
Name of Contractor: Messrs. GITTO COSTRUZIONI GEN. Ltd
Contract Sum for Phase I (N): 6,410,761,817.46
Completion Period (Prorated): 13 Months
Length (km): 14.415

9e) Project Description: Rehabilitation of Okpuala – Igwurunta Road
Name of Contractor: Messrs. Triacta (Nig) Ltd.
Contract Sum for Phase I (N): 6,410,761,817.46
Completion Period (Prorated): 6 Months
Length (km): 17.475
Grand Total
Contract Sum for Phase I (N): 44,891,179,113.67

10) Award of Contracts for the Construction of 2NO. 132KV Double Circuit Transmission Lines for the Transmission Company of Nigeria Plc (Ministry of Power)

10a) Lot No.: Lot 2010-09
Description: Award of contract for Engineering, Procurement and Construction and Commissioning of the 90km Onitsha – Oba – Nnewi – Ideato – Okigwe 132kv Double Circuit Transmission Line
Name of Company: Messrs. DUAL/Zamil Steels Limited
Cost: USD5,522,962.50 payable at prevailing rate of exchange Plus N497,907,048.00 inclusive of a provisional sum of N290,428,530.00 for Right of Way compensation,5% VAT on onshore payments and 10% Contingency
Date: 01/12/10
Completion Period: 12 Months

10b) Lot No.: Lot 2010-14
Description: Award of contract for Engineering, Procurement and Construction and Commissioning of the 60km Akwanga – Lafia 132 Double Circuit Transmission Line
Name of Company: Messrs. Bateman (Nigeria) Limited
Cost: €3,338,276.55 payable at prevailing rate of exchange Plus N692,115,902.56 inclusive of a provisional sum of N240,427,932.56 for Right of Way,5% VAT on on-shore payments and 10% ContingencyDate: 01/12/10

Completion Period:
12 Months

11) Award of contracts for the Design, Manufacture, Supply, Installation and Commissioning of 6NO. Transmission Sub-Stations for the Transmission Company of Nigeria Plc (Ministry of Power)

11a) Lot No.: Lot 2010-23
Description: Award of contract for Design, manufacture, supply, installation and commissioning of 2 x 30/40MVA, 132/33KV Sub- Station at Kurfi and 2 x 132KV Line bay extension at Katsina Sub-Station
Name of Company: Messrs. Gracehill Energy (Nigeria) Limited
Cost: USD6,105,517.80 payable at the prevailing exchange rate Plus N734,549,919.57 inclusive of a provisional sum of N194,581,696.57 for 5% VAT on onshore payments, Compensation and Contingency
Date: 01/12/10
Completion Period: 24 Months

11b) Lot No.: Lot 2010-24
Description: Award of contract for Design, manufacture, supply, installation and commissioning of 2 x 30/40MVA, 132/33KV Sub- Station at Dutsinma and 2 132KV Line bay extension at Kurfi Sub-Station
Name of Company: Messrs. Hoquado Limited
Cost: USD5,198,128.02 payable at the prevailing exchange rate Plus N634,538,803.43 inclusive of a provisional sum of N167,340,451.43 for 5% VAT on onshore payments, Compensation and Contingency
Date: 01/12/10
Completion Period: 24 Months

 
11c) Lot No.: Lot 2010-25
Description: Award of contract for Design, manufacture, supply, installation and commissioning of 2 30/40MVA, 132/33KV Sub- Station at Kankara and 2 132KV Line bay extension at Dutsinma Sub-Station
Name of Company: Messrs. PELNESPAK JVCost: USD5,060,587.05 payable at the prevailing exchange rate Plus N621,885,416.60 inclusive of a provisional sum of N163,128,272.60 for 5% VAT on onshore payments, Compensation and Contingency
Date: 01/12/10
Completion Period: 24 Months

 
11d) Lot No.: Lot 2010-27
Description: Award of contract for Design, manufacture, supply, installation and commissioning of 2 x 30/40MVA, 132/33KV Sub-Station at Danbatta and 132KV Line bay extension at Daura
Name of Company: Messrs. PEL – NESPAK Joint Venture
Cost: USD5,337,939.80 payable at the prevailing exchange rate Plus N700,851580.00 inclusive of a provisional sum of N177,641,754.00 for 5% VAT on Onshore payments, Compensation and Contingency
Date: 01/12/10
Completion Period: 24 Months

 
11e) Lot No.: Lot 2010-28
Description: Award of contract for Design, manufacture, supply, installation and commissioning of 2 x 60MVA, 132/33KV Sub-Station at Amasiri, Afikpo and 132KV Line bay extension at Abakaliki
Name of Company: Messrs. Techno Electric & Engineering
Cost: USD5,155,455.22 payable at the prevailing exchange rate Plus N649,688,788.79 inclusive of a provisional sum of N168,473,013.79 for 5% VAT on Onshore payments, Compensation and Contingency
Date: 01/12/10
Completion Period: 24 Months

 
11f) Lot No.: Lot 2010-32
Description: Award of contract for Design, manufacture, supply, installation and commissioning of 2 x 60MVA, 132/33KV Sub-Station at Mpu with 2 x 132KV Line bay extension at Nnenwe
Name of Company: Messrs. Ashtavinayaka/ Bran Engineering Limited
Cost: USD5,280,555.33 payable at the prevailing exchange rate Plus N654,381,750.79 inclusive of a provisional sum of N170,992,955.79 for 5% VAT on Onshore payments, Compensation and Contingency
Date: 01/12/10
Completion Period: 24 Months